Product Description
Introduction:
waste steel materials can be separated into nonferrous, stainless steel,rubber,plastic and other garbage, recycling of the waste can be realized.
Price Terms︰
FOB Dalian
Payment Terms︰
30% paid for deposit by T/T and the balance should be paid upon the copy of B/L.
Packing︰
standard packing
Lead Time︰
within 50days after receive the deposit